Muara Laboh Geothermal Power - Case Study (ADB)
The project will develop, operate, and maintain geothermal steam resources and an 80 MW power generation unit in the Liki Pinangawan Muara Laboh concession area.
This project involves a $70 million loan from Asian Development Bank (ADB) with $19.25 million Clean Technology Fund (CTF) concessional financing and a $20 million parallel loan funded through Leading Asia's Private Sector Infrastructure (LEAP) Fund.
Read More.........
Tuesday, 16 January 2018

Home
energy
geothermal
geothermal plant
geothermal power
GRC
renewable
Indonesia: Asian Development Bank Case Study on 80 MW Muara Laboh Geothermal Power Project
Indonesia: Asian Development Bank Case Study on 80 MW Muara Laboh Geothermal Power Project
Tags
# energy
# geothermal
# geothermal plant
# geothermal power
# GRC
# renewable
renewable
Labels:
energy,
geothermal,
geothermal plant,
geothermal power,
GRC,
renewable
Subscribe to:
Post Comments (Atom)
Author Details
Templatesyard is a blogger resources site is a provider of high quality blogger template with premium looking layout and robust design. We provide the best quality blogger templates which are professionally designed and perfectlly seo optimized to deliver best result for your blog.
No comments:
Post a Comment